Back before the extensions were built to expand the high school, tunnels and walkways were constructed beneath the older structure, creating a maze of disjointed underground paths. Strange occurrences are frequently reported, including malfunctioning equipment that causes erratic temperature shifts throughout the building. Hatches leading into these areas reportedly vibrate periodically with audible growling sounds, and objects near slightly opened tunnel entrances are pulled downward.
